ConocoPhillips received the go-ahead to start up production at its Eldfisk Nord project in the North Sea, the Norwegian Offshore Directorate said Feb. 28.
The $1.24 billion Eldfisk Nord project includes two seabed templates for production and one for water injection, serving a total of nine production wells and five injection wells in 230 ft water depth. Start-up is expected during the first quarter of 2024.
ConocoPhillips is targeting 50 MMbbl to 90 MMbbl of reserves with the project.
The Eldfisk Field is in Block 2/7 and is part of the Greater Ekofisk Area. Eldfisk Nord will help increase the recovery rate from the Ekofisk and Tor formations.
Eldfisk was discovered in 1970, and the plan for development and operation (PDO) was approved in 1975. An amended PDO for Eldfisk, including the development of resources in Eldfisk Nord, was approved in December 2022.
ConocoPhillips operates PL 018 on behalf of partners TotalEnergies, Vår Energi, Sval Energi and Petoro.
Recommended Reading
Seatrium Awarded Contract for FPSO Bound for Guyana’s Stabroek
2024-05-17 - The topsides fabrication and integration contract will be for the FPSO Jaguar, bound for the Whiptail Field in the Stabroek block offshore Guyana for Exxon Mobil.
Third Suriname Find for Petronas, Exxon Could Support 100,000 bbl/d FPSO
2024-05-17 - A recent find offshore Suriname in Block 52 by Petronas and Exxon Mobil could support a 100,000 bbl/d FPSO development, according to Wood Mackenzie.
US Drillers Add Oil, Gas Rigs for First Time in Four Weeks: Baker Hughes
2024-05-17 - The oil and gas rig count rose by one to 604 in the week to May 17.
BPX Looks to Ramp US Production Over 60% by 2030
2024-05-16 - BPX Energy is looking to boost its U.S. production over 60% by 2030 as it considers bringing online a fourth processing facility in the Permian by mid-year 2025, Clark Edwards, the company’s vice president of development, said during SUPER DUG in Fort Worth.
Empire Petroleum’s Williston Drilling Program Identifies New Zones
2024-05-16 - Empire Petroleum provided updates on its Williston Basin development drilling program in its first quarter 2024 earnings results.